GOSPEL ISLAND BRIDGE REPLACEMENT
location:
Citrus County, FL
Client:
FDOT
Completed:
2007
Awards:
FDOT 2007 Best in Construction Bridge Project Award
This project was performed under stringent environmental considerations. The obsolete bridge was replaced with a new 160’ long, 5 span structure that incorporated a composite deck design, (precast slab topped with a 6 ½" concrete deck).  As the bridge closure required residents to navigate a 9 mile detour route, the work was expedited earning an Early Completion Incentive Bonus.