SR 200 (US 301) EXPANSION
location:
Duval and Nassau Counties, FL
Client:
FDOT
Completed:
2015
Located in the rural area between Baldwin and Callahan, this project consisted of reconstruction of  17 miles of US-301 from two lanes to a four-lane divided highway.  Twin multi-span low level bridges founded on 24” concrete piling supporting flat slab cast-in-place decks were built at five creek locations.  A twin single span FIB girder bridge was built over the Norfolk & Southern Railroad.