I-95 OVER 4TH STREET, 90TH AVENUE AND SR 60
location:
Indian River County, FL
Client:
FDOT
Completed:
2015
This Design-Build project consists of the widening of I-95 and reconstruction of three bridges in Indian River County utilizing multi-phase construction methods, thereby minimizing impacts to traffic.  Our work included the removal and replacement of the existing bridges over 4th Street, 90th Avenue, and SR 60 including the temporary critical walls.