I-4 FROM EAST OF SR 44 TO WEST OF I-95
location:
Volusia County, FL
Client:
FDOT
Completed:
2015
This project includes the complete reconstruction of I-4 between Deland and Daytona. Our subcontracted work includes construction of two ramp bridges over I-4 and US 92, multiple animal crossings, and the removal and replacement of the existing low level bridges over the Tomoka River. Early completion of the Ramp B bridge over US 92 was vital to the project to relieve congestion during Daytona International Speedway events. To add another level of aesthetics, the new Ramp A bridge over I-4 was the first slipformed, stamped barrier wall constructed in Florida.